Any suggestions on how to accomplish a dynamic method for deploying office 2013?
I have DFS in place and the CAB/DAT files have been replicated to all 230 locations.
For the XML file, I was thinking of using an injected script via provisioning. Is there a variable that would translate to the Preferred Server?